Challenge
SUAS GROUP and EIF, a.s. needed to build a battery storage of unprecedented scale in Lipnice near Sokolov, one that stabilizes the Czech power grid and also trades on the electricity market.
The project was exceptionally demanding both technically and logistically. From the start the maximum emphasis was placed on safety and long-term reliability of the whole solution.
Solution
As general contractor we delivered the whole storage with an installed capacity of 120 MWh and a power output of 57 MW. The solution consists of technology weighing over 1,500 tonnes: 144 battery cabinets, 18 power converter sets and 9 transformer skids.
The storage stabilizes the Czech power grid, provides balancing services for ČEPS and trades on the day-ahead and intraday electricity markets. It could supply a city the size of Sokolov with electricity for about ten hours.
The numbers after implementation
The battery storage in Lipnice was exceptionally demanding, both technically and logistically. From the start we placed maximum emphasis on safety and long-term reliability of the whole solution. The result is a modern and robust facility that meets high demands for safe operation.