Charging infrastructure for your fleet.
Planning to replace or expand your vehicle fleet with electric vehicles? Taking your existing power grid connection into account, we design, supply, and install charging stations with outputs up to 350 kW. If your connection capacity isn't sufficient, we'll design the optimal combination of a charging station with battery storage.
Fleet electrification without upgrading your grid connection.
Electrifying a corporate fleet most often runs into grid connection capacity limits. Before we design the number and output of chargers, we analyze the building's energy balance and the real-world charging profile of your vehicles.
If the connection isn't sufficient, we combine the charging station with battery storage (see Energy Storage) — paired with solar power, this cuts fast-charging costs by up to 60% compared to a public charging station, with no need to upgrade your connection.
12 MW installed in 2024
In 2024 alone, we commissioned charging stations with a combined output of 12 MW.
Up to 400 kW per charging point
DC split technology scales from a few kW for corporate fleets to a 400 kW hub at a high-traffic location.
Combined with storage
Combined with solar power and battery storage, you can cut fast-charging costs by up to 60%.
Reference project for ČEZ
We supply charging hubs for ČEZ on the D1 and D10 motorways and at other locations across the Czech Republic.
Does this sound like you?
The most common situations where fleet electrification comes up.
Switching your fleet to electric vehicles
You need charging infrastructure that can charge your entire fleet overnight and between shifts.
Parking for employees and visitors
An employee benefit and company vehicles alike call for a scalable network of charging points.
Limited grid connection capacity
Smart load management, combined with storage where needed, lets you charge more vehicles without upgrading your connection.
Fast charging on the road
Chargers up to 400 kW for highway rest stops and high-traffic locations, with split technology that allows future power upgrades.
Specifications
We build solutions from individual charging points, load management, and optional storage.
| Power output | 7.4 – 400 kW |
|---|---|
| Standards | CCS / CHAdeMO / Type 2 |
| Control | OCPP / smart charging |
| Annual installed capacity | 12 MW (2024) |
| Stations installed | 115 units (2023-2025), 93 in 2025 alone |
References
Charging Station for ČEZ in Tuchoměřice
Nine dispenser units with power up to 400 kW at a charging point right next to Václav Havel Airport.