Home / References / ČEZ, a.s.

Charging Station for ČEZ in Tuchoměřice

ClientČEZ, a.s.
IndustryEnergy
MarketCZ
Year2025
SolutionsCharging infrastructure
Challenge

Challenge

ČEZ needed to build a fast-charging hub at a busy location near Prague airport, capable of handling peak demand without compromising the power of individual points.

At the same time, the split-architecture technology had to be designed so power could be further increased in the future without a major rebuild of the station.

Solutions

Solution

We delivered 9 dispenser units and 10 power cabinets with DC power up to 400 kW per charging point.

The split-architecture technology separates the power electronics from the dispenser units, allowing the station's capacity to be increased in the future without having to change the layout of the dispensers.

Results

The numbers after implementation.

9
Dispenser units
400 kW
Power per charging point
2025
Year of commissioning
Ready to get started?

Have a similar challenge? Give us a call.

We'll calculate your payback period from real data. No obligation, no sales talk.

Request a solution
Call Mon–Fri 8am–5pm
+420 315 721 445