Challenge
Challenge
For its solar plant near Střítež, LCJ Invest needed expert installation of the AC/DC part, including integration with dispatch control.
Seamless communication between the plant and the higher-level dispatch center had to be ensured from day one of operation.
Solutions
Solution
We carried out the installation of the AC/DC part of the 278.1 kWp solar system.
The delivery also included integration with dispatch control, providing the necessary oversight of the plant's operation.
Results
The numbers after implementation.
278,1 kWp
Installed solar power
AC/DC
Installation scope
2023
Year of commissioning
Related