Olomouc University Hospital wanted to reduce electricity costs across its large, continuously operating campus without compromising the reliability of power supply to critical facilities.
The installation required a precise design of the AC/DC part and integration with dispatch control so the solar plant would reliably cooperate with the rest of the hospital's energy system.
Solutions
Solution
We supplied and installed a 422 kWp solar system, including the AC/DC part.
We connected the system to the hospital's dispatch control for continuous monitoring of the plant's operation.
Results
The numbers after implementation
422 kWp
Installed solar power
AC/DC
Installation scope
2023
Year of commissioning